Institutional Buildings

Tap here to open…

Projects

  • Projects_Healthcare_HospitalforSickChildren2
    The Hospital for Sick Children

    MMM has been the engineer of record for SickKids Hospital for almost 30 years, including overseeing $450M in construction costs for mechanical, electrical, structural, IT, and security system designs Provided municipal servicing and stormwater management for the 24-storey research tower, including three levels of underground parking Projects include operating room upgrades, construction of the state-of–the-art…

  • project_LabResearch_McMasterNuclearResearch5
    McMaster University Nuclear Research Building

    McMaster University’s three-storey, 2,193m² state-of-the-art nuclear research facility consists of labs, offices, and amenity spaces for staff, and is one of several LEED-certified buildings on the campus MMM Group provided best-practice commissioning and building performance monitoring, in addition to LEED and energy-efficiency consulting Facilitated sustainable design features such as reflective roofing, low-flow fixtures, energy recovery…

  • York Regional Police Investigative Services Building
    York Regional Police Investigative Services Building

    This facility houses administrative functions, emergency support (explosives disposal, canine unit, collision reconstruction), investigative services (major crimes, organized crimes, forensic identification), evidence storage, information services, maintenance facilities for police vehicles, and a three-level above-ground parking garage. Design features of this building include access control systems; video surveillance; software integration requirements; displacement ventilation; under-floor air distribution;…

  • Sunnybrook Health Sciences Centre S-Wing
    Sunnybrook Health Sciences Centre S-Wing

    80,000-ft2 fit-out of levels four and five of the Sunnybrook Health Sciences Centre S-Wing, including precise pressurization control for various spaces such as large and small animal holding rooms, operating rooms, necropsy suites, and procedure rooms Design team used specialized air valves to provide pressure-independent control valves in tracking pairs to maintain the desired volumetric…

See all related Projects results

Experts

  • bio_Vancouver_GeorgeMelo
    George Melo

    George Melo, P.Eng., FEC, LEED AP Senior Project Manager, Buildings Partner Key Highlights: More than 28 years’ experience in the design, construction, and inspection of electrical systems for wide variety of new, renovated, and upgraded medium- to large-scale buildings, including healthcare, institutional, correctional, commercial and airport projects Skilled in providing project management, value engineering, sustainable…

  • bio_SustainabilityandEnergyModelling_PCorrieMooney
    P. Corrie Mooney

    P. Corrie Mooney, P.Eng., LEED AP Project Principal, Buildings – Sustainability Key Highlights: Assists building design teams in reducing building energy use and meeting sustainability design objectives including LEED certification Extensive experience in mechanical engineering of HVAC and plumbing systems, boiler plants, cooling systems, and ground source heat pumps More than 14 years of professional experience…

See all related Experts results