Doug Dixon

bio_bridges_DougDixon

Doug Dixon, M.A.Sc., P.Eng.

Senior Project Manager, Bridges

Partner

Key Highlights:

  • More than 30 years experience in the planning and preliminary and detailed design of all aspects of new bridges and rehabilitations, as well as bridge inspections, evaluations, and assessments on numerous bridges for federal, provincial, and private owners
  • Experience includes movable and fixed highway bridges, as well as pedestrian-and rail-carrying structures
  • Extensive large-span bridge experience, including experience on most of the international border crossings between Ontario and the United States

Select Project Experience:

  • F.G. Gardiner Expressway, Toronto, Ontario
  • Carlingview Drive Grade Separation, Toronto, Ontario
  • Highway 3 Bridge Replacement over Grand River, Cayuga, Ontario
  • Peace Bridge Annual Inspection: 2008 – 2012, Fort Erie, Ontario – Buffalo, NY, U.S.A
  • Sault Ste. Marie International Bridge, Inspection and Evaluation, Sault Ste. Marie, Ontario
  • Whirlpool International Bridge, Steel Strengthening, Cleaning and Coating, Niagara Falls, Ontario
  • Preliminary Design of Garden City Skyway Bridge, Twinning and Rehabilitation, St. Catherines, Ontario
  • Evaluation, Inspection and Detailed Design of Steel Reinforcement, Burlington Skyway Toronto Bound Structure, Burlington, Ontario
Contact Doug Dixon