Geraldton District Airport

  • Reconstruction of Runway 08/26, taxiway and apron including detailed design, contract preparation, and cost estimates
  • Installation of subdrains and drainage improvements, and complete airfield lighting replacement
  • Apron was expanded near the Ministry of Natural Resources facilities

Roles:

  • site surveys
  • geotechnical surveys
  • airport design
  • construction supervision
  • electrical engineering