Main Sheldon Creek and N1 Diversion Channel Design

  • The Main Sheldon Creek is a meandering channel, with riffle / pool sequences and step / pool sequences at its upstream and downstream limits, developed to permit fish passage for its entire length
  • The N1 Diversion Channel diverts flows from a tributary of Sheldon Creek to its main branch
  • MMM provided natural channel design, fluvial geomorphology, surveying, aquatic and terrestrial ecological assessments, hydraulic modeling, and flood plain mapping
  • Designed two pedestrian bridges and two road crossings, as well as a riparian planting scheme

Roles:

  • natural channel design
  • fluvial geomorphology
  • surveying
  • aquatic and terrestrial ecological assessments
  • hydraulic modelling
  • flood plain mapping