Mount Albert Production Well No. 3

  • MMM Group was retained by the Region of York to carry out a Schedule ‘B’ class environmental assessment and route selection study, preliminary engineering, detailed design, and construction administration to service the planned growth and increased water demand in the community of Mount Albert
  • Environmental, technical, and economic criteria were used to evaluate the water supply alternatives
  • Pumping station design included a vertical turbine deep well pump rated at 37 L/s, chemical feed system, chlorine gas disinfection system, emergency diesel generator, and integrated process control system

Roles:

  • class environmental assessment
  • route selection study
  • municipal engineering