QEW Credit River Crossing Environmental Assessment and Preliminary Design

  • Provided preliminary design and class environmental assessment study to determine a long-term strategy for the rehabilitation needs of the Queen Elizabeth Way (QEW) Credit River Bridge, and future requirements for the QEW from Mississauga Road to west of Hurontario Street
  • Recommended a new twin bridge be constructed to the north of the existing bridge to allow for rehabilitation of the existing bridge, as well as geometric and operational improvements to the mainline QEW and the adjacent Mississauga Road interchange
  • Participated in extensive consultation with local residential community and key stakeholders throughout development of plan