The Hospital for Sick Children

MMM has been the engineer of record for SickKids Hospital since 1985

  • MMM has been the engineer of record for SickKids Hospital for almost 30 years, including overseeing $450M in construction costs for mechanical, electrical, structural, IT, and security system designs
  • Provided municipal servicing and stormwater management for the 24-storey research tower, including three levels of underground parking
  • Projects include operating room upgrades, construction of the state-of–the-art Cardiac Diagnostic Intervention Unit, mechanical and electrical central plant replacements, and the synchronization of seven generators from three different buildings to increase the available emergency power capacity to critical patient care areas

Roles:

  • electrical engineering
  • mechanical engineering
  • surveying
  • Project recognized by PUGs as a runner up for one of the most popular new commercial / institutional buildings in Toronto

  • Location: Toronto, Ontario