- MMM Group (MMM) provided surveying, design, and contract administration services for the installation of a 2.7-km long sanitary sewer
- Wastewater main was installed by open cut using Horizontal Directional Drilling (HDD) trenchless methods for the undercrossing of the QEW flyover ramps and two Enbridge high pressure pipelines
- MMM reviewed specifications of HDD bore plan, and delivered continuous monitoring of the drill head progress throughout construction to ensure compliance with proposed alignment and specified elevations
Winston Park Sanitary Sewer Horizontal Directional Drilling
-
Location: Oakville, Ontario